^ top
 
Home А А А
Қаз Рус Eng   
 
     
   
 
Sunday, 5 april 2020
 
     
 
News
Which street would you like to repair in Almaty?
08 august 2018

During the last three years, in Almaty has been repaired 524 streets for 500 km.

So, in the line of the passenger transport and highways department in 2016, within the framework of an average repair 140 km of road cover were renewed in 196 streets. All the main streets and 80% of local roads had the current repair. 30.5 km sidewalks were done for pedestrians.

In 2017, more than 170 streets for 147.1 km had the medium repair. There was also built and repaired 37.5 km of sidewalks. In Shevchenko, Kunaev, Utepov streets and at 23 roundabouts, dismantled the old tramways in order to enlarge the road and 16.7 km of new asphalt concretes were done.

This year in Almaty, there was done the medium repair of 157 more streets for more than 155 km. In addition, along Makatayev, Baytursynov and Zharokov streets, a carriageway was expanded and a new asphalt was laid for 15.7 km. 30 km sidewalks were done for pedestrians.

It should be mentioned that while doing the medium repairs of the street-road network, three-year warranty is given by the contractor. During this period, the organization is responsible to correct any identified shortcomings and violations by his own expense.

On behalf of the Almaty’s executive committee,a special attention is paid to the sidewalks repair and irrigation ditches. Dismantling of unused structures and landscaping is carried out. Because of the pedestrian’s movement obstacles made by the illegal seizure of various outbuildings, there was a survey of sidewalks.

In parallel, this year three new traffic interchanges are being constructed to increase capacity on the small transport ring, the reorganization of several streets and the organization of a high-speed bus corridor, bridge structures are being enlarged, etc.

The reconstruction of the historic center of the city is being done by the construction management department. All underground ways were done by the district executive committees. If 500 yards were landscaped last year, this year more than 600 Almaty courts would be renewed.

In general, according to the department of passenger transport and highways today, road repair works have been completed in 123 streets. Until August 25, the medium repair will be finished in another 34 streets of the city.

You know that we also have the department of energy and communal services, which is very fond of digging and doing something.

In fact, this is a very responsible and laborious work that should be done. That people had light, water, heat, sewage. Only the last year almost 800 km of engineering networks were built and reconstructed.

Unfortunately, there are also unscrupulous contractors participating in an open tender, so somewhere there are failures, in the literal sense of the word. We naturally force them to do everything again within the framework of the guarantee obligations.

To eliminate identified defects on the roads, 4 contract organizations and 12 special teams were additionally involved.

After the modernization of engineering communications along 21 streets this year, an average repair of another 12.5 km of roads has been organized.

There is also a so-called patch repair. 175 thousand sq.m. city streets were repaired. By the end of the year, another 370,000 m2 of road surface will be covered.

Next year, the department of passenger transport and highways of Almaty is already beginning to formulate a work plan for 2019.

We expect to update even more than 150 km of city roads. By the principle of polycentricity, we go to all parts of the city. We will also focus on the lower part of Almaty. And we are counting on you, Almaty residents!

Almaty’s executive committee expects your concrete proposals. Where do you think it is necessary to repair the road or lay a new pavement?

Applications are accepted until the end of September this year. Send information to us on the special e-mail : zhol.almaty@a-a.kz with the note "Need a road repair" or "Need a pavement"

The official representative of Almaty’s executive committee :Timur Bazarbaev

  «« | »» «  | All news


B. Sagintayev: The celebration of the 1150th anniversary of Abu Nasr al-Farabi - an expression of respect for the heritage of a Great thinker of the Kazakh land »»
30 january 2020 - 15:16
In 2020, the 1150th anniversary of a world-famous philosopher, the great thinker Abu Nasr al-Farabi is being celebrated. The opening of the year took place in Almaty.   Akim of Almaty, Bakytzhan Sagintayev, noted that the event is a veneration and expression of respect for the spiritual heritage of the great thinker of the Middle Ages, encyclopedist and philosopher Abu Nasr al-Farabi, who made an invaluable contribution to the development of science and civilization in the world. “We take pri...
A Programming school will open in Almaty
30 january 2020 - 15:05
This was announced by the Akim of Almaty Bakytzhan Sagintayev on his official Twitter account.   The implementation of the project to create an advanced programming school was discussed during a bilateral meeting with one of the founders of the Paris school "42" and the educational platform "01 Edu System" Nicolas Sadirac. “We discussed the creation of a programming school in Almaty. The unique experience and methodology of digital learning will help our talented youth real...
The digitalization experience of London will be used in Almaty
30 january 2020 - 15:37
The Akim of Almaty Bakytzhan Sagintayev announced this on his official Twitter account.   The exchange of experience and the application of best practices were discussed at a bilateral meeting of Bakytzhan Sagintayev with Chris Ferguson, director of the UK Government Digital Service. “We discussed issues of cooperation and exchange of experience on the implementation of the Smart City concept in Almaty, in the areas of ecology, transport and public safety, as well as education and the training...
 
     
   
 
 
 
Kazpost Services
 
 
 
 
 
 
All rights for materials contained on this site are reserved by Administration of Almaty
©2005-2019 Republic Square, 4 050001 Almaty, RK, Information contents and support: Press- service of Mayor of Almaty Telephone of Press-service of Almaty Mayor: +7 (727) 271-65-56